Magtech .32 S&W long lead round head 6.4g/98grs. .32 S&W Long - Frankonia Wholesale B2B ✓ Germany ✓ International
PRODUCT DETAILS
item description
- high quality and manufacturing standard
- inexpensive
- reliable
Since 1926, the company has developed true to its motto "The best possible quality at a competitive price". Continuous modernization, the processing of selected materials and quality controls throughout the entire production process ensure that Magtech meets the internationally high quality and manufacturing standards. Not least because of this Magtech Ammunition successfully exported to over 65 countries worldwide. Even today, the extremely favorable price-performance ratio is convincing.
1.4

Danger. Danger from fire or splinters, explosives and projectiles. Keep away from heat, hot surfaces, sparks, open flames and other ignition sources. Do not smoke.
Details on product safety
As a responsible trading company, we attach great importance to transparency and compliance with legal requirements. Under the EU regulation, we are obliged to provide information about the responsible economic operator. This operator is responsible for compliance with EU regulations on our products.
Responsible economic operator according to EU regulation
Manufacturer
Frankonia Handels GmbH & Co.KG
Schießhausstraße 10
97228 Rottendorf, DE
mail@frankonia.de
EU Responsible Person
Frankonia Handels GmbH & Co.KG
Schießhausstraße 10
97228 Rottendorf, DE
mail@frankonia.de
| Data | Values |
|---|---|
| EN: Geschossgewicht (g/grs) | 6,4/98 |
| bullet type | lead - RN |
| Manufacturer | Magtech |
| manufacturer number | 32SWLA |
| EN: Packungsgröße (Stück) | 50 |
| EN: Fluggeschwindigkeit V0 (m/s) | 215 |
| EN: Geschossenergie E0 (Joule) | 147 |
| EAN Code | 7891798043125 |

&quality=40)
&quality=40)
&quality=40)
&quality=40)
&quality=40)
&quality=40)