0

Magtech .32 S&W long lead wadcutter 6.4g/98grs. .32 S&W Long - Frankonia Wholesale B2B ✓ Germany ✓ International

Magtech .32 S&W long lead wadcutter 6.4g/98grs.

.32 S&W long lead wadcutter 6.4g/98grs., Magtech
.32 S&W long lead wadcutter 6.4g/98grs., Magtech
.32 S&W long lead wadcutter 6.4g/98grs., Magtech
Extra-Rabatt-Flag
.32 S&W long lead wadcutter 6.4g/98grs., Magtech
.32 S&W long lead wadcutter 6.4g/98grs., Magtech
.32 S&W long lead wadcutter 6.4g/98grs., Magtech
Item number:
144834-99

Magtech .32 S&W long lead wadcutter 6.4g/98grs.

Dealer price:
-
Retail Price:
25,00 €
Quantity discount (Pieces per package 50 piece)
PiecePrice per packageSaving
1
-
-/-
20
-
-1 %
100
-
-8 %
500
-
-11 %
Caliber:
.32 S&W Long
Availability:
-
Availability:
-

    PRODUCT DETAILS

    item description
    • inexpensive
    • Lead Wadcutter bullet
    • reliable

    Revolver cartridge for target shooting. More than 80 years of experience guarantee the internationally high quality and manufacturing standard.

    1.4

    explosive 1.4
    Warning. Danger of fire or explosion, including projectiles. Keep away from heat, hot surfaces, sparks, open flames, and other ignition sources. No smoking.

     
    Details on product safety
    As a responsible trading company, we attach great importance to transparency and compliance with legal requirements. Under the EU regulation, we are obliged to provide information about the responsible economic operator. This operator is responsible for compliance with EU regulations on our products.

    Data sheet:

    DataValues
    EN: Geschossgewicht (g/grs)6,4/98
    bullet typeLead - WC
    ManufacturerMagtech
    manufacturer number32SWLB
    EN: Packungsgröße (Stück)50
    EN: Fluggeschwindigkeit V0 (m/s)208
    EN: Geschossenergie E0 (Joule)137
    EAN Code7891798043132
    LAST SEEN PRODUCTS