Magtech .32 S&W long lead wadcutter 6.4g/98grs. .32 S&W Long - Frankonia Wholesale B2B ✓ Germany ✓ International
PRODUCT DETAILS
item description
- inexpensive
- Lead Wadcutter bullet
- reliable
Revolver cartridge for target shooting. More than 80 years of experience guarantee the internationally high quality and manufacturing standard.
1.4

Warning. Danger of fire or explosion, including projectiles. Keep away from heat, hot surfaces, sparks, open flames, and other ignition sources. No smoking.
Details on product safety
As a responsible trading company, we attach great importance to transparency and compliance with legal requirements. Under the EU regulation, we are obliged to provide information about the responsible economic operator. This operator is responsible for compliance with EU regulations on our products.
Responsible economic operator according to EU regulation
Manufacturer
Frankonia Handels GmbH & Co.KG
Schießhausstraße 10
97228 Rottendorf, DE
mail@frankonia.de
EU Responsible Person
Frankonia Handels GmbH & Co.KG
Schießhausstraße 10
97228 Rottendorf, DE
mail@frankonia.de
| Data | Values |
|---|---|
| EN: Geschossgewicht (g/grs) | 6,4/98 |
| bullet type | Lead - WC |
| Manufacturer | Magtech |
| manufacturer number | 32SWLB |
| EN: Packungsgröße (Stück) | 50 |
| EN: Fluggeschwindigkeit V0 (m/s) | 208 |
| EN: Geschossenergie E0 (Joule) | 137 |
| EAN Code | 7891798043132 |
&quality=40)
&quality=40)
&quality=40)
&quality=40)
&quality=40)
&quality=40)